Wedi transforms the work of tiling

Tiling on Fundo - Step 2

   The first stage of tiling is to install the grid support frame(right). The extension collar should be cut to length if it is required to compensate for the thickness of the tiles or stone.

    Apply cement-based flexible adhesive to the top surface of the Fundo. Make sure that the corners of the grid support align with the corners of the Fundo.

    Apply more adhesive and commence tiling (below).



   That concludes the installation sequence for wedi Fundo.
Floor surface with Tilebacker